Yesterday, they finished the cabling for this house. It is on step 2 out of 12 steps.Wednesday, September 30, 2009
Thursday, September 24, 2009
Tuesday, September 22, 2009
12 Steps to Build a New House in this community
Based on the builder, there are 12 steps after finishing the design. Each step takes about 2 weeks.
Step 1, Prepare lot, Plumbing
Step 2, Foundation and Frame
Step 3, Roof Rafters
Step 4, Roof, Window, Plumbing
Step 5, Gas and Electric
Step 6, Insulation, Brick, Drive Way Concrete
Step 7, Paint, Cabinet, Doors
Step 8, Paint Wall, Tile Bath
Step 9, Eclectic, Fence, Mirror
Step 10, Tile, Grass, Lock
Step 11, Electricity and Gas Meter, Carpet
Step 12, Closing
Step 1, Prepare lot, Plumbing
Step 2, Foundation and Frame
Step 3, Roof Rafters
Step 4, Roof, Window, Plumbing
Step 5, Gas and Electric
Step 6, Insulation, Brick, Drive Way Concrete
Step 7, Paint, Cabinet, Doors
Step 8, Paint Wall, Tile Bath
Step 9, Eclectic, Fence, Mirror
Step 10, Tile, Grass, Lock
Step 11, Electricity and Gas Meter, Carpet
Step 12, Closing
Lay Out Pipes
Friday, September 18, 2009
Thursday, September 17, 2009
Another New House Start Building Process
Subscribe to:
Comments (Atom)