In last two days, workers came to installed water pipes inside of the house. They also laid out the gas pipes. Air condition pipes were brought in and installed. A truck came and cleaned up the site.
house. Since there was some rain last weekend, it slowed down the framing. It will take another two days to finish up it.
Today, worker came to layout the cable for foundation. You can see this the red cable in front of this picture. Electricity meter was also installed this week so the water and electricity is available now for use.